See our products
for your
business


Some of the most effective solutions on the global market

Own industrial test stand

To study all aspects of the process and improve the technology

"Carbon-containing materials" utilization complex based on GPD gasifiers, with subsequent production of electric and thermal energy
ranging from 0.2 to 4 MW/h

  • Manufacturing time: 3-7 months
  • Payment terms: negotiable
  • Shipping terms: DDP – Poland
  • Transportation: transporting these complexes requires 2 to 14 truck convoys.
  • Installation, commissioning, and staff training: 1-2 months, included in the cost of the complexes.
  • Equipment warranty: 12 months for cogeneration equipment and 18 months for gasification equipment

all carbon-containing materials:

  • Wood and RDF (pellets, briquettes)
  • Wood chips (including railway sleeper chips)
  • Poultry manure (pellets, briquettes)
  • Automotive tires (5-30 mm)
  • Elevator waste and all types of husks (pellets, briquettes)
  • Peat (pellets, briquettes)
  • Wastewater residues, and more
5-18%
99%
0.2-4 MW/h (+ 0.2-4 MW of thermal energy)
2-4 people

BS430-1

EXEMPLE OF 1 MW/H

Average production cost per 1 kWh = EUR 0.06-0.07


We also supply turnkey solutions:

  • Waste processing complexes for municipal solid waste (MSW) with subsequent production of renewable RDF fuel (1-15 t/h)
  • Biomass pelletizing and briquetting lines (1-15 t/h)
  • Biomass and RDF drying complexes (1-15 t/h)
  • "Living bottom" feeder-dispenser (10-200 m³)
  • Biomass, tire, and sleeper shredders (1-15 t/h)
  • Chipping machines (1-55 t/h)
  • Hammer mills (1-15 t/h)
  • Pelletizers (1-5 t/h)
  • Cooling towers (1-15 t/h)
  • Briquetting presses (hydraulic, impact, screw-type) (1-3 t/h)
  • Steam boilers with solid fuel heat generators (1-15 t/h)
  • Solid fuel heat generators (0.5-15 MW/h)
  • Bunkers (0.5-50 m³)
  • Conveyors of all types (1-15 t/h)
  • Cogeneration machines (0.2-5 MW/h)
  • Non-standard equipment and other